ADJUSTABLE CLIMBING WALLS 

The frame that
supports
every system.

Lemur adjustable climbing walls are the only frames on the market compatible with every major system: Kilter, Tension, Moon, So iLL, or build your own spray wall. 

Get A Quote
MKIII
LATEST VERSION
–21%​

MORE AFFORDABLE

+5°
NEW SLAB ANGLE
+Stiffness

REINFORCED STRUCTURE 

 
MKIII New Generation — Stiffer, More Accessible, Future-Ready 

The Lemur third-generation frame redefines adjustable climbing wall infrastructure with three core advances. First, the frame is 21% more accessible — same Lemur quality, re-engineered for value without compromise. Second, the new +5° slab angle makes this the first adjustable climbing wall to drop below vertical into true slab terrain. Third, the reinforced structure delivers improved flatness and stability across every angle, ensuring consistent performance whether you're climbing vertical or overhanging.  

 THE RANGE 

3 Products.

Every project.

From private spaces to professional commercial climbing gyms — Lemur adjustable climbing wall frames cover every use case with the same manufacturing rigor. Each frame is system-agnostic: compatible with Kilter, Tension, Moon, So iLL, or a spray wall setup and can be with semi automatic !!or full automatic settings.

Home wall

8×10ft and up

32 Standard sizes


Footprint required — 30–50 m²

Min. height — 4.0 m

Angle range — +5° slab – 70°

Installation — 1 DAY

Certification — CE - CSA - UL

Semi Automatic settings

Kilter · Tension · Moon · So iLL · Spray


 Request a quote 

Original

8×10ft  and up

32 Standard sizes


Footprint required — 50 – 100 m²

Min. height —​ ​4.0 m

Angle range — +5° slab – 70°

Installation — ​1 DAY

Certification — CE - CSA - UL

Fully Automatic settings

Kilter · Tension · Moon · So iLL · Spray


Request a quote 



Slab Wall

16×12ft and up 

8 Standard sizes


Footprint required — 50 – 100 m²

Min. height — ​4.5 m

Angle range — ​+10° slab - 40°

Installation — 1 DAY

Certification — CE - CSA - UL

Fully or Semi Automatic settings

Spray or Boulder Wall


Request a quote 



Manual or Fully Automatic Control

Our manually adjustable wall uses a simple three-button control: one button to raise the wall, one to lower it, and a selector switch to operate both actuators together or adjust the left and right sides independently. The movement continues only while the operator holds the button, providing direct and intuitive control.

Our fully automatic system offers a more advanced, elevator-like experience. A touchscreen lets users select the desired angle without continuously holding a button, while integrated safety controls manage the movement automatically. Owners can also define operating limits, restricting the wall’s angle range to suit their facility, users, or programming.

Both solutions work internationally.


 COMPATIBILITY 

Climbing Frame Compatibility — Choose Your System

Your adjustable climbing frame. Your system. No lock-in. The Lemur climbing frame is independent of any system. Install Tension today, add Moon tomorrow, or build a pure spray wall with zero subscription dependency.

Tension

  The benchmark connected climbing wall system for structured training. Global community, shared problems, precision progress tracking. Our top recommendation for adjustable climbing wall installations.

 Home - Standard

View Page

Kilter

The most widespread LED system. Lemur frames are fully compatible — Kilter is one option among those Lemur supports.

 Home - Standard

View Page 



Moon

The technical reference since 2004. Over 100,000 problems in the app. A globally standardized format.

 Home - Standard

View Page

So iLL

The most accessible system. The Connect Board opens your gym's community to every level.

Home - Standard

View Page 

Spray/Boulder wall  

Zero dependency. Your holds, your setter, your identity. The purest form of adjustable climbing wall freedom — 100% Lemur territory, no subscription lock-in. Ideal for gyms building their own climbing training identity.

 All size · No lock-in 

 

 THEY HAVE PLACED THEIR TRUST IN LEMUR 

Some Board Rooms

signed Lemur.

Project Climbing 

Cloverdale — C anada

Training zone.

Arc'teryx — The Nest

Vancouver — Canada​

7 200 sq. ft. Community hub.

LMG Monceau

Paris 8e — France

Corporate premium Club. 

GRIP Boulderhal

Nijmegen — Pays-Bas

5 000 m². 
Adjustable boulder walls.

Climb Up Istres

Istres — France

Full climbing gym. 

Honnold Gym

Nevada — USA

Private Home Gym.
Fixed + adjustable walls.

 FROM INQUIRY TO OPENING DAY 

4 steps. 

Our process is proven across 550 installations. 

No bad surprises.

01

Quote & sign-off 

We disucss with you the configuration, scope, pricing and schedule.

02

Manufactruring and shipping

Your wall is manufactured to order, carefully packed and shipped directly to your site. Typical lead time: 8–12 weeks.


03

1-day installation ​

No specialized tooling. Your space is operational the same evening.


04

Support & maintenance ​

Maintenance plan available. 24h support. Parts available immediately.


The frame is ready. 
Choose your system. ​

Tell us about your project — footprint, height, system. We reply within 24h.


Describe my project